Act on the result
Confirm the crossover, available hire capacity and overtime contribution before choosing how to cover demand.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Owners comparing overtime with a fixed-plus-variable hire scenario at a known demand level.
Overtime and nullable hire cost, lower-cost state, crossover hours and an exact overtime-cost contribution module.
Enter additional demand and both cost structures, then use the embedded module to inspect your overtime pay terms and contribution.
Use a different tool when: Do not use this to test a hire against billable contribution; use Hiring Break-even Planner for that decision. Use this tool to compare overtime and hire cost at an entered demand level, including capacity and exact overtime-cost contribution.
Profit & break-even
Overtime and nullable hire cost, lower-cost state, crossover hours and an exact overtime-cost contribution module.
Amounts use the same currency as your inputs. No currency conversion is performed.
Use your own records on one consistent period, capacity, currency and tax basis.
Your numbers stay in this browser
Additional productive demand to cover.
Fully loaded overtime cost used in the main comparison. Use one consistent currency and indirect-tax basis.
One-off or period-fixed cost applied to every whole hire required. Use one consistent currency and indirect-tax basis.
Loaded productive-hour cost applied to every available hour of each whole hire. Use one consistent currency and indirect-tax basis.
Productive capacity available from each whole hire in the decision period.
Results come from the registered exact staffing engines. A component table is used because it is clearer than a chart for this decision.
| Option | Available hours | Cost | Decision state |
|---|---|---|---|
| Overtime | 500 | 45,000 | Lower cost |
| Hire | 1,000 | 70,000 | overtime |
| Crossover | 778 | โ | Raw whole-hour threshold |
Edit this six-field module independently. It has no standalone route or public tool identity.
regular hours ร base hourly rate ร (1 + on-cost rate)2,000.00Uses only the six editable assumptions in this embedded module. The exact engine retains raw precision; display rounding does not feed calculation.
Overtime cost module formulas โovertime hours ร base rate ร multiplier ร (1 + on-cost rate)750.00Uses only the six editable assumptions in this embedded module. The exact engine retains raw precision; display rounding does not feed calculation.
Overtime cost module formulas โregular labour cost + overtime labour cost2,750.00Uses only the six editable assumptions in this embedded module. The exact engine retains raw precision; display rounding does not feed calculation.
Overtime cost module formulas โovertime hours ร contribution per hour โ overtime labour cost250.00Uses only the six editable assumptions in this embedded module. The exact engine retains raw precision; display rounding does not feed calculation.
Overtime cost module formulas โbase hourly rate ร multiplier ร (1 + on-cost rate)75.00Uses only the six editable assumptions in this embedded module. The exact engine retains raw precision; display rounding does not feed calculation.
Overtime cost module formulas โEach row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
required additional hours ร overtime cost per hour45,000.00Uses user-entered staffing records and assumptions on one consistent period, capacity and currency basis. The exact engine retains raw precision; bounded display formatting does not feed calculation.
Overtime vs Hire Comparison formulas โwhole hires required ร (fixed cost per hire + available productive hours per hire ร hire cost per productive hour)70,000.00Uses user-entered staffing records and assumptions on one consistent period, capacity and currency basis. The exact engine retains raw precision; bounded display formatting does not feed calculation.
Overtime vs Hire Comparison formulas โceil(required additional hours รท hire available productive hours)1 unitsUses user-entered staffing records and assumptions on one consistent period, capacity and currency basis. The exact engine retains raw precision; bounded display formatting does not feed calculation.
Overtime vs Hire Comparison formulas โcompare raw scenario costsovertimeUses user-entered staffing records and assumptions on one consistent period, capacity and currency basis. The exact engine retains raw precision; bounded display formatting does not feed calculation.
Overtime vs Hire Comparison formulas โceil(whole-hire cash cost รท overtime hourly cost), when reachable within one hire capacity778 hoursUses user-entered staffing records and assumptions on one consistent period, capacity and currency basis. The exact engine retains raw precision; bounded display formatting does not feed calculation.
Overtime vs Hire Comparison formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| hireAvailableProductiveHours | Productive capacity available from each whole hire in the decision period. | productive hours/hire/decision period | 0 to 100000000 | Required | 1000 |
| hireCostPerProductiveHourExTax | Loaded productive-hour cost applied to every available hour of each whole hire. Use one consistent currency and indirect-tax basis. | currency units/productive hour, ex tax | 0 to 10000000 | Required | 60 |
| hireFixedCostExTax | One-off or period-fixed cost applied to every whole hire required. Use one consistent currency and indirect-tax basis. | currency units/hire, ex tax | 0 to 10000000 | Required | 10000 |
| overtimeCostPerHourExTax | Fully loaded overtime cost used in the main comparison. Use one consistent currency and indirect-tax basis. | currency units/overtime hour, ex tax | 0 to 10000000 | Required | 90 |
| requiredAdditionalHours | Additional productive demand to cover. | productive hours/decision period | 0 to 100000000 | Required | 500 |
Use the lower-cost state only when the hire scenario has enough productive capacity and the pay assumptions are confirmed.
Data used here
Confirm the crossover, available hire capacity and overtime contribution before choosing how to cover demand.
Retest higher hire fixed cost, lower available capacity and a higher user-entered overtime on-cost rate.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Build a period labour-cost envelope, test timing and capacity scenarios, and identify decision boundaries before hiring.
Read guideConfirm the crossover, available hire capacity and overtime contribution before choosing how to cover demand.
Keep the time basis, units and included costs consistent across options, then verify the assumptions that create the largest difference.