Act on the result
Confirm ramp time, management burden and minimum supplier commitments before deciding.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Businesses comparing outsourced delivery with the loaded capacity of an internal hire.
Outsource cost, loaded hire cost, delivered capacity, option difference and crossover workload.
Use the same workload and service scope for both options before adding hiring or supplier risk costs.
Use a different tool when: Do not use this to test a hire against billable contribution; use Hiring Break-even Planner for that decision. Use this tool to compare outsourcing with the loaded cost and capacity of an internal hire.
Profit & break-even
Outsource cost, loaded hire cost, delivered capacity, option difference and crossover workload.
Amounts use the same currency as your inputs. No currency conversion is performed.
Compare incremental outsourcing and hiring costs at the required workload, including explicit capacity gaps and excluded sunk cost.
Your numbers stay in this browser
Enter the whole units required for the decision period.
Record committed cost for disclosure; the engine explicitly excludes it from the comparison. Use one consistent ex-tax currency basis.
Include only avoidable or new fixed cost for outsource. Use one consistent ex-tax currency basis.
Include only cost that changes per unit for outsource. Use one consistent ex-tax currency basis.
Enter the maximum whole units outsource can deliver in the period.
Include only avoidable or new fixed cost for hire. Use one consistent ex-tax currency basis.
Include only cost that changes per unit for hire. Use one consistent ex-tax currency basis.
Enter the maximum whole units hire can deliver in the period.
Review the operating threshold and incremental comparison on the same entered capacity, cost and demand basis.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
outsource incremental fixed cost + required units ร outsource incremental cost per unit, if capacity is sufficient8,600.00Uses the exact shared engine result and only the entered market-neutral operating assumptions. The engine retains raw precision; display formatting does not feed calculation.
Outsource vs Hire Comparison formulas โhire incremental fixed cost + required units ร hire incremental cost per unit, if capacity is sufficient10,200.00Uses the exact shared engine result and only the entered market-neutral operating assumptions. The engine retains raw precision; display formatting does not feed calculation.
Outsource vs Hire Comparison formulas โcompare the two exact incremental costs after capacity feasibilityleftUses the exact shared engine result and only the entered market-neutral operating assumptions.
Outsource vs Hire Comparison formulas โceiling((right fixed cost โ left fixed cost) / (left unit cost โ right unit cost)), when reachable within both capacities166 unitsUses the exact shared engine result and only the entered market-neutral operating assumptions. The engine retains raw precision; display formatting does not feed calculation.
Outsource vs Hire Comparison formulas โmax(0, required units โ outsource capacity)0 unitsUses the exact shared engine result and only the entered market-neutral operating assumptions. The engine retains raw precision; display formatting does not feed calculation.
Outsource vs Hire Comparison formulas โmax(0, required units โ hire capacity)0 unitsUses the exact shared engine result and only the entered market-neutral operating assumptions. The engine retains raw precision; display formatting does not feed calculation.
Outsource vs Hire Comparison formulas โcurrent sunk cost disclosed but excluded from both incremental options2,500.00Uses the exact shared engine result and only the entered market-neutral operating assumptions. The engine retains raw precision; display formatting does not feed calculation.
Outsource vs Hire Comparison formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| currentSunkCost | Record committed cost for disclosure; the engine explicitly excludes it from the comparison. Use one consistent ex-tax currency basis. | currency units/decision period, ex tax | 0 to 10000000 | Required | 2500 |
| leftCapacityUnits | Enter the maximum whole units outsource can deliver in the period. | units/period | 0 to 100000000 | Required | 220 |
| leftIncrementalFixedCost | Include only avoidable or new fixed cost for outsource. Use one consistent ex-tax currency basis. | currency units/decision period, ex tax | 0 to 10000000 | Required | 200 |
| leftIncrementalVariableCostPerUnit | Include only cost that changes per unit for outsource. Use one consistent ex-tax currency basis. | currency units/unit, ex tax | 0 to 10000000 | Required | 70 |
| rightCapacityUnits | Enter the maximum whole units hire can deliver in the period. | units/period | 0 to 100000000 | Required | 220 |
| rightIncrementalFixedCost | Include only avoidable or new fixed cost for hire. Use one consistent ex-tax currency basis. | currency units/decision period, ex tax | 0 to 10000000 | Required | 6000 |
| rightIncrementalVariableCostPerUnit | Include only cost that changes per unit for hire. Use one consistent ex-tax currency basis. | currency units/unit, ex tax | 0 to 10000000 | Required | 35 |
| units | Enter the whole units required for the decision period. | units/period | 0 to 100000000 | Required | 120 |
Compare the same delivered workload and service level rather than headline hourly rates.
Data used here
Confirm ramp time, management burden and minimum supplier commitments before deciding.
Retest slower hiring, higher utilisation requirements and supplier price changes.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Compare internal and subcontracted delivery capacity on one loaded-cost, recovery, timing and risk boundary.
Read guideCompare commission and rental structures on aligned revenue, loaded cost, capacity and risk assumptions.
Read guideConfirm ramp time, management burden and minimum supplier commitments before deciding.
Keep the time basis, units and included costs consistent across options, then verify the assumptions that create the largest difference.