Act on the result
Compare the headcount gap with hiring, contractor and scheduling options.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Service teams translating billable demand into delivery headcount.
Billable capacity per person, required headcount and capacity gaps.
Enter demand, available hours and a realistic target utilisation.
Use a different tool when: Do not use this to align quote wins with delivery capacity; use Quote Win Capacity Planner for that decision. Use this tool to translate billable demand into headcount.
Quote & capacity
Billable capacity per person, required headcount and capacity gaps.
Translate billable demand into required delivery headcount.
Your numbers stay in this browser
Demand for the period.
Total working capacity.
Share available for billable work.
Current delivery team.
Every result is derived by the registered service and project engine.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
ceil(required billable hours รท billable capacity per person)9 countReports count from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Utilisation to Headcount Planner formulas โavailable hours per person ร target utilisation120 hours/periodReports hours/period from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Utilisation to Headcount Planner formulas โrequired headcount โ current headcount2 countReports count from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Utilisation to Headcount Planner formulas โcurrent headcount ร billable capacity per person840 hours/periodReports hours/period from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Utilisation to Headcount Planner formulas โrequired billable hours โ current billable capacity160 hours/periodReports hours/period from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Utilisation to Headcount Planner formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| availableHoursPerPerson | Total working capacity. | hours/person/period | 0 to 10000000 | Required | 160 |
| currentHeadcount | Current delivery team. | people | 0 to 10000000 | Required | 7 |
| requiredBillableHours | Demand for the period. | hours/period | 0 to 10000000 | Required | 1000 |
| targetUtilisation | Share available for billable work. | proportion of paid capacity billable | 0 to 0.99 | Required | 0.75 |
The utilisation to headcount result uses only the entered commercial assumptions.
Data used here
Compare the headcount gap with hiring, contractor and scheduling options.
Lower utilisation and available hours before committing to capacity.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Connect utilisation, recovery rate, scope delivery and committed pipeline without treating one ratio as an agency forecast.
Read guideCompare the headcount gap with hiring, contractor and scheduling options.
Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.