Act on the result
Use the result to define a change request or tighter scope boundary.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Project owners measuring the commercial effect of work beyond scope.
Extra hours, extra cost, recovered revenue and contribution erosion.
Compare contracted hours with actual or expected delivery hours.
Use a different tool when: Do not use this to set a minimum project fee; use Minimum Project Fee Planner for that decision. Use this tool to measure unrecovered scope change.
Quote & capacity
Extra hours, extra cost, recovered revenue and contribution erosion.
Amounts use the same currency as your inputs. No currency conversion is performed.
Measure contribution erosion from extra project hours.
Your numbers stay in this browser
Original project fee.
Hours included in scope.
Expected or recorded hours.
Internal hourly cost.
Revenue recovered per extra hour.
Every result is derived by the registered service and project engine.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
quoted contribution โ actual contribution450/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Scope Creep Impact Planner formulas โactual hours โ quoted hours15 hours/projectReports hours/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Scope Creep Impact Planner formulas โextra hours ร delivery cost per hour1,200/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Scope Creep Impact Planner formulas โextra hours ร recoverable extra rate750/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Scope Creep Impact Planner formulas โcontracted revenue โ quoted delivery cost6,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Scope Creep Impact Planner formulas โcontracted revenue + recovered revenue โ actual delivery cost5,550/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Scope Creep Impact Planner formulas โtotal recovered revenue รท actual hours165.38/hourReports/hour from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Scope Creep Impact Planner formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| actualHours | Expected or recorded hours. | hours/project | 0 to 10000000 | Required | 65 |
| contractedRevenue | Original project fee. | currency units/project | 0 to 10000000 | Required | 10000 |
| deliveryCostPerHour | Internal hourly cost. | currency units/hour | 0 to 10000000 | Required | 80 |
| quotedHours | Hours included in scope. | hours/project | 0 to 10000000 | Required | 50 |
| recoverableExtraRate | Revenue recovered per extra hour. | currency units/hour | 0 to 10000000 | Required | 50 |
The scope creep impact result uses only the entered commercial assumptions.
Data used here
Use the result to define a change request or tighter scope boundary.
Retest with no extra-hour recovery and a higher delivery cost.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Record and cost added work, compare absorb, partial-charge and full re-quote paths, then stop for approval.
Read guideUse the result to define a change request or tighter scope boundary.
Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.