What this planner helps you decide

Best for

Project owners measuring the commercial effect of work beyond scope.

Outputs

Extra hours, extra cost, recovered revenue and contribution erosion.

Start here

Compare contracted hours with actual or expected delivery hours.

Use a different tool when: Do not use this to set a minimum project fee; use Minimum Project Fee Planner for that decision. Use this tool to measure unrecovered scope change.

Quote & capacity

Scope Creep Impact: extra hours

Extra hours, extra cost, recovered revenue and contribution erosion.

Amounts use the same currency as your inputs. No currency conversion is performed.

Scope Creep Impact

Measure contribution erosion from extra project hours.

Your numbers stay in this browser

currency units

Original project fee.

Hours included in scope.

Expected or recorded hours.

currency units

Internal hourly cost.

currency units

Revenue recovered per extra hour.

Decision result

Every result is derived by the registered service and project engine.

PDF and CSV exports stay on this device. Clean page links contain no inputs.
Extra Hours
15 hours/project
Extra Delivery Cost
1,200.00/project
Recoverable Revenue
750.00/project
Quoted Contribution
6,000.00/project
Actual Contribution
5,550.00/project
Contribution erosion
450.00/project
Actual Effective Rate
165.38/hour

Scenario comparison

Each row names the assumption axis changed from the baseline.

ScenarioResultDifference
Current scenario450.00/projectBaseline
Lower Actual hours352.50/projectโˆ’97.50/project (โˆ’21.7%)
Higher Actual hours547.50/project+97.50/project (+21.7%)

Save these results, change an input, then compare the updated figures with this baseline.

The baseline is temporary in this tab and is not added to shared scenario links or generated reports.

Calculation details

View calculation detailsView the formulas and inputs used for these results.

Contribution erosion

Contribution Erosionquoted contribution โˆ’ actual contribution450/project
Result450.00/project

Reports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.

Scope Creep Impact Planner formulas โ†’
Inputs used by these formula steps
Contribution ErosionContracted Revenue
10,000
Contribution ErosionQuoted Hours
50
Contribution ErosionActual Hours
65
Contribution ErosionDelivery Cost Per Hour
80
Contribution ErosionRecoverable Extra Rate
50

Extra Hours

Extra Hoursactual hours โˆ’ quoted hours15 hours/project
Result15 hours/project

Reports hours/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.

Scope Creep Impact Planner formulas โ†’
Inputs used by these formula steps
Extra HoursContracted Revenue
10,000
Extra HoursQuoted Hours
50
Extra HoursActual Hours
65
Extra HoursDelivery Cost Per Hour
80
Extra HoursRecoverable Extra Rate
50

Extra Delivery Cost

Extra Delivery Costextra hours ร— delivery cost per hour1,200/project
Result1,200.00/project

Reports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.

Scope Creep Impact Planner formulas โ†’
Inputs used by these formula steps
Extra Delivery CostContracted Revenue
10,000
Extra Delivery CostQuoted Hours
50
Extra Delivery CostActual Hours
65
Extra Delivery CostDelivery Cost Per Hour
80
Extra Delivery CostRecoverable Extra Rate
50

Recoverable Revenue

Recoverable Revenueextra hours ร— recoverable extra rate750/project
Result750.00/project

Reports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.

Scope Creep Impact Planner formulas โ†’
Inputs used by these formula steps
Recoverable RevenueContracted Revenue
10,000
Recoverable RevenueQuoted Hours
50
Recoverable RevenueActual Hours
65
Recoverable RevenueDelivery Cost Per Hour
80
Recoverable RevenueRecoverable Extra Rate
50

Quoted Contribution

Quoted Contributioncontracted revenue โˆ’ quoted delivery cost6,000/project
Result6,000.00/project

Reports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.

Scope Creep Impact Planner formulas โ†’
Inputs used by these formula steps
Quoted ContributionContracted Revenue
10,000
Quoted ContributionQuoted Hours
50
Quoted ContributionActual Hours
65
Quoted ContributionDelivery Cost Per Hour
80
Quoted ContributionRecoverable Extra Rate
50

Actual Contribution

Actual Contributioncontracted revenue + recovered revenue โˆ’ actual delivery cost5,550/project
Result5,550.00/project

Reports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.

Scope Creep Impact Planner formulas โ†’
Inputs used by these formula steps
Actual ContributionContracted Revenue
10,000
Actual ContributionQuoted Hours
50
Actual ContributionActual Hours
65
Actual ContributionDelivery Cost Per Hour
80
Actual ContributionRecoverable Extra Rate
50

Actual Effective Rate

Actual Effective Ratetotal recovered revenue รท actual hours165.38/hour
Result165.38/hour

Reports/hour from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.

Scope Creep Impact Planner formulas โ†’
Inputs used by these formula steps
Actual Effective RateContracted Revenue
10,000
Actual Effective RateQuoted Hours
50
Actual Effective RateActual Hours
65
Actual Effective RateDelivery Cost Per Hour
80
Actual Effective RateRecoverable Extra Rate
50

Inputs used

Contracted revenue
10,000
Quoted hours
50
Actual hours
65
Delivery cost per hour
80
Recoverable extra-hour rate
50
Open this calculator with preset values

This calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.

Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.

Example: https://margin101.com/tools/scope-creep-impact/?sv=1&actualHours=65&contractedRevenue=10000&deliveryCostPerHour=80&quotedHours=50&recoverableExtraRate=50

ParameterMeaningUnitAllowed valuesPresenceDefault
actualHoursExpected or recorded hours.hours/project0 to 10000000Required65
contractedRevenueOriginal project fee.currency units/project0 to 10000000Required10000
deliveryCostPerHourInternal hourly cost.currency units/hour0 to 10000000Required80
quotedHoursHours included in scope.hours/project0 to 10000000Required50
recoverableExtraRateRevenue recovered per extra hour.currency units/hour0 to 10000000Required50

Scope Creep Impact: extra hours

The scope creep impact result uses only the entered commercial assumptions.

Formula summary

Primary formula
contribution erosion = quoted contribution โˆ’ actual contribution

Read the full methodology

Data used here

  • The estimate uses your inputs and the general business formula documented in the methodology.

Decision checks

Act on the result

Use the result to define a change request or tighter scope boundary.

Stress-test the decision

Retest with no extra-hour recovery and a higher delivery cost.

When this estimate can be misleading

  • Results depend on the accuracy and consistent basis of user-entered assumptions.
  • The planner does not forecast demand, delivery performance or contract outcomes.
  • Use the result as educational business decision support, not accounting, tax or legal advice.
  • The scope creep impact result uses only the entered commercial assumptions.

Educational estimate, not advice. See all assumptions & limitations โ†’

Guides to interpret the decision and its assumptions.

  • Scope Change Quote Checklist

    Record and cost added work, compare absorb, partial-charge and full re-quote paths, then stop for approval.

    Read guide

Frequently asked questions

How do I measure unrecovered scope change?

Use the result to define a change request or tighter scope boundary.

Which planning assumptions should I stress-test?

Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.