Act on the result
Set a price buffer or contract control for the weighted and worst-case exposure.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Project owners comparing best, base and worst delivery duration risk and a price-buffer response.
Case contribution, weighted duration and cost, risk-adjusted contribution, buffered worst-case contribution and downside coverage.
Enter ordered best, base and worst durations and probabilities, monthly delivery cost and a price buffer.
Use a different tool when: Do not use this to set a sustainable monthly retainer; use Retainer Pricing Planner for that decision. Use this tool to price best, base and worst project duration exposure.
Quote & capacity
Case contribution, weighted duration and cost, risk-adjusted contribution, buffered worst-case contribution and downside coverage.
Amounts use the same currency as your inputs. No currency conversion is performed.
Compare best, base and worst duration cases and test a price buffer response.
Your numbers stay in this browser
Project revenue.
Cost during planned delivery.
Upside duration.
Probability of the upside case.
Expected duration.
Probability of the base case.
Downside duration.
Probability of the downside case.
Additional revenue tested against downside duration.
Every result is derived by the registered service and project engine.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
revenue โ probability-weighted delivery cost34,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โrevenue โ best months ร monthly cost55,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โrevenue โ base months ร monthly cost40,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โrevenue โ worst months ร monthly cost10,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โฮฃ(case months ร probability)4.4 monthsReports months from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โexpected duration ร monthly delivery cost66,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โrisk-adjusted contribution รท contract revenue0.34 decimal rateReports decimal rate from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โcontract revenue ร (1 + price buffer)110,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โbuffered revenue โ worst-case cost20,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โbuffered worst contribution โ unbuffered worst contribution10,000/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Project Duration Risk Planner formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| baseCaseMonths | Expected duration. | months/project | 0 to 10000000 | Required | 4 |
| baseCaseProbability | Probability of the base case. | decimal probability | 0 to 0.99 | Required | 0.5 |
| bestCaseMonths | Upside duration. | months/project | 0 to 10000000 | Required | 3 |
| bestCaseProbability | Probability of the upside case. | decimal probability | 0 to 0.99 | Required | 0.2 |
| contractRevenue | Project revenue. | currency units/project | 0 to 10000000 | Required | 100000 |
| monthlyDeliveryCost | Cost during planned delivery. | currency units/month | 0 to 10000000 | Required | 15000 |
| priceBufferRate | Additional revenue tested against downside duration. | proportion of expected delivery cost added as risk buffer | 0 to 0.99 | Required | 0.1 |
| worstCaseMonths | Downside duration. | months/project | 0 to 10000000 | Required | 6 |
| worstCaseProbability | Probability of the downside case. | decimal probability | 0 to 0.99 | Required | 0.3 |
The project duration risk result uses only the entered commercial assumptions.
Data used here
Set a price buffer or contract control for the weighted and worst-case exposure.
Increase worst-case duration and probability, then retest the price buffer.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Map scope uncertainty, cost the agreed delivery boundary and choose a commercial response before calculating the exact quote.
Read guideSet a price buffer or contract control for the weighted and worst-case exposure.
Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.