Act on the result
Quote the rush surcharge separately and state the delivery window.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Service owners pricing genuinely compressed project delivery.
Compressed hours, incremental rush cost, surcharge and minimum rush fee.
Enter the normal and compressed delivery windows plus displaced contribution.
Use a different tool when: Do not use this to recover travel delivery cost; use Travel Time Billing Planner for that decision. Use this tool to price compressed delivery.
Quote & capacity
Compressed hours, incremental rush cost, surcharge and minimum rush fee.
Amounts use the same currency as your inputs. No currency conversion is performed.
Recover the incremental economics of compressed delivery.
Your numbers stay in this browser
Normal project price.
Normal delivery window in hours.
Compressed delivery window.
Extra cost caused by compression.
Contribution lost from other work.
Margin retained on the surcharge.
Every result is derived by the registered service and project engine.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
incremental rush cost รท (1 โ target margin)1,200/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Rush Fee Pricing Planner formulas โstandard hours โ rush hours10 hours/projectReports hours/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Rush Fee Pricing Planner formulas โovertime hours ร incremental cost + displaced contribution900/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Rush Fee Pricing Planner formulas โstandard fee + minimum rush surcharge6,200/projectReports/project from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Rush Fee Pricing Planner formulas โminimum rush surcharge รท standard fee0.24 decimal rateReports decimal rate from the entered project, capacity and ex-tax commercial assumptions. The engine retains full precision; presentation is bounded for readability.
Rush Fee Pricing Planner formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| displacedContribution | Contribution lost from other work. | currency units/project | 0 to 10000000 | Required | 350 |
| overtimeCostPerHour | Extra cost caused by compression. | currency units/hour | 0 to 10000000 | Required | 55 |
| rushHours | Compressed delivery window. | hours/project | 0 to 10000000 | Required | 30 |
| standardFee | Normal project price. | currency units/project | 0 to 10000000 | Required | 5000 |
| standardHours | Normal delivery window in hours. | hours/project | 0 to 10000000 | Required | 40 |
| targetMargin | Margin retained on the surcharge. | proportion of rush fee retained as contribution | 0 to 0.99 | Required | 0.25 |
The rush fee pricing result uses only the entered commercial assumptions.
Data used here
Quote the rush surcharge separately and state the delivery window.
Retest the displaced work and incremental cost assumptions.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Check capacity, displaced contribution, scope and delivery risk before deciding whether and how to quote urgent work.
Read guideQuote the rush surcharge separately and state the delivery window.
Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.