What this planner helps you decide

Best for

Construction businesses planning the cash effect of retention withholding and release timing.

Outputs

Retention withheld and released, expected final release date, actual receipts, project outflows and peak funding gap.

Start here

Align certified work, payment receipts and cost outflows to the same project window.

Use a different tool when: Do not use this to align milestone billing with cost timing and retention; use Progress Billing Cash Planner for that decision. Use this tool to model construction retention withholding, release timing and project cash exposure.

Quote & capacity

Construction Retention: receipts and project outflows

Retention withheld and released, expected final release date, actual receipts, project outflows and peak funding gap.

Amounts use the same currency as your inputs. No currency conversion is performed.

Your industry scenario

Reconcile certified construction work, retention withheld and released, prior certification and cash already received.

Your numbers stay in this browser

%

Rate withheld under the entered contract assumption.

currency units

Maximum retention balance allowed under the entered contract assumptions. Keep every amount on the same ex-tax currency basis.

Whole days from the last claim date to expected final retention release.

currency units

Cash available to fund the two claim periods.

Enter the first claim date as eight digits in YYYYMMDD format.

currency units

Work certified in the first claim period. Keep every amount on the same ex-tax currency basis.

currency units

All customer cash actually received in the first claim period, including any payment arising from released retention. The separate release field updates the retention ledger and is not added to cash again. Keep every amount on the same ex-tax currency basis.

currency units

Retention released during the first claim period. Keep every amount on the same ex-tax currency basis.

currency units

Labour, supplier and subcontractor cash paid in the first period. Keep every amount on the same ex-tax currency basis.

Enter the later claim date as eight digits in YYYYMMDD format.

currency units

Work certified in the second claim period. Keep every amount on the same ex-tax currency basis.

currency units

All customer cash actually received in the second claim period, including any payment arising from released retention. The separate release field updates the retention ledger and is not added to cash again. Keep every amount on the same ex-tax currency basis.

currency units

Retention released during the second claim period. Keep every amount on the same ex-tax currency basis.

currency units

Labour, supplier and subcontractor cash paid in the second period. Keep every amount on the same ex-tax currency basis.

Industry decision result

See the current claim, cash due now and cumulative cash position without treating held retention as received cash. Review every output on the same entered business basis.

Preparing export actionsโ€ฆ
Total certified work
210,000.00
Total retention withheld
10,500.00
Total retention released
0.00
Retention still held
10,500.00
Total collectible amount
199,500.00
Total cash received
170,000.00
Cash still due
29,500.00
Project cost outflow
200,000.00
Closing project cash
-15,000.00
Peak project funding gap
15,000.00
First shortfall date
2026-02-28
Expected final retention release date
2026-04-29

Scenario comparison

Each row names the assumption axis changed from the baseline.

ScenarioResultDifference
Current industry scenario15,000.00Baseline
Lower First claim cash received22,000.007,000.00
Higher First claim cash received8,000.00-7,000.00

Save these results, change an input, then compare the updated figures with this baseline.

The baseline is temporary in this tab and is not added to shared scenario links or generated reports.

Calculation details

View calculation detailsView the formulas and inputs used for these results.

Total certified work

Total certified worksum of certified work across claim periods210,000 , ex tax
Result210,000.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Total certified workRetention Rate
0.05
Total certified workRetention Cap Ex Tax
30,000
Total certified workExpected Release Delay Days
60
Total certified workOpening Project Cash Ex Tax
15,000
Total certified workFirst Claim Date Code
20,260,131
Total certified workFirst Certified Work Ex Tax
90,000
Total certified workFirst Cash Received Ex Tax
70,000
Total certified workFirst Retention Released Ex Tax
0
Total certified workFirst Project Cost Outflow Ex Tax
82,000
Total certified workSecond Claim Date Code
20,260,228
Total certified workSecond Certified Work Ex Tax
120,000
Total certified workSecond Cash Received Ex Tax
100,000
Total certified workSecond Retention Released Ex Tax
0
Total certified workSecond Project Cost Outflow Ex Tax
118,000

Total retention withheld

Total retention withheldsum of claim retention subject to the cap10,500 , ex tax
Result10,500.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Total retention withheldRetention Rate
0.05
Total retention withheldRetention Cap Ex Tax
30,000
Total retention withheldExpected Release Delay Days
60
Total retention withheldOpening Project Cash Ex Tax
15,000
Total retention withheldFirst Claim Date Code
20,260,131
Total retention withheldFirst Certified Work Ex Tax
90,000
Total retention withheldFirst Cash Received Ex Tax
70,000
Total retention withheldFirst Retention Released Ex Tax
0
Total retention withheldFirst Project Cost Outflow Ex Tax
82,000
Total retention withheldSecond Claim Date Code
20,260,228
Total retention withheldSecond Certified Work Ex Tax
120,000
Total retention withheldSecond Cash Received Ex Tax
100,000
Total retention withheldSecond Retention Released Ex Tax
0
Total retention withheldSecond Project Cost Outflow Ex Tax
118,000

Total retention released

Total retention releasedsum of released retention across claim periods0 , ex tax
Result0.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Total retention releasedRetention Rate
0.05
Total retention releasedRetention Cap Ex Tax
30,000
Total retention releasedExpected Release Delay Days
60
Total retention releasedOpening Project Cash Ex Tax
15,000
Total retention releasedFirst Claim Date Code
20,260,131
Total retention releasedFirst Certified Work Ex Tax
90,000
Total retention releasedFirst Cash Received Ex Tax
70,000
Total retention releasedFirst Retention Released Ex Tax
0
Total retention releasedFirst Project Cost Outflow Ex Tax
82,000
Total retention releasedSecond Claim Date Code
20,260,228
Total retention releasedSecond Certified Work Ex Tax
120,000
Total retention releasedSecond Cash Received Ex Tax
100,000
Total retention releasedSecond Retention Released Ex Tax
0
Total retention releasedSecond Project Cost Outflow Ex Tax
118,000

Retention still held

Retention still heldretention withheld - retention released10,500 , ex tax
Result10,500.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Retention still heldRetention Rate
0.05
Retention still heldRetention Cap Ex Tax
30,000
Retention still heldExpected Release Delay Days
60
Retention still heldOpening Project Cash Ex Tax
15,000
Retention still heldFirst Claim Date Code
20,260,131
Retention still heldFirst Certified Work Ex Tax
90,000
Retention still heldFirst Cash Received Ex Tax
70,000
Retention still heldFirst Retention Released Ex Tax
0
Retention still heldFirst Project Cost Outflow Ex Tax
82,000
Retention still heldSecond Claim Date Code
20,260,228
Retention still heldSecond Certified Work Ex Tax
120,000
Retention still heldSecond Cash Received Ex Tax
100,000
Retention still heldSecond Retention Released Ex Tax
0
Retention still heldSecond Project Cost Outflow Ex Tax
118,000

Total collectible amount

Total collectible amountcertified work - retention withheld + retention released199,500 , ex tax
Result199,500.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Total collectible amountRetention Rate
0.05
Total collectible amountRetention Cap Ex Tax
30,000
Total collectible amountExpected Release Delay Days
60
Total collectible amountOpening Project Cash Ex Tax
15,000
Total collectible amountFirst Claim Date Code
20,260,131
Total collectible amountFirst Certified Work Ex Tax
90,000
Total collectible amountFirst Cash Received Ex Tax
70,000
Total collectible amountFirst Retention Released Ex Tax
0
Total collectible amountFirst Project Cost Outflow Ex Tax
82,000
Total collectible amountSecond Claim Date Code
20,260,228
Total collectible amountSecond Certified Work Ex Tax
120,000
Total collectible amountSecond Cash Received Ex Tax
100,000
Total collectible amountSecond Retention Released Ex Tax
0
Total collectible amountSecond Project Cost Outflow Ex Tax
118,000

Total cash received

Total cash receivedsum of cash receipts across claim periods170,000 , ex tax
Result170,000.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Total cash receivedRetention Rate
0.05
Total cash receivedRetention Cap Ex Tax
30,000
Total cash receivedExpected Release Delay Days
60
Total cash receivedOpening Project Cash Ex Tax
15,000
Total cash receivedFirst Claim Date Code
20,260,131
Total cash receivedFirst Certified Work Ex Tax
90,000
Total cash receivedFirst Cash Received Ex Tax
70,000
Total cash receivedFirst Retention Released Ex Tax
0
Total cash receivedFirst Project Cost Outflow Ex Tax
82,000
Total cash receivedSecond Claim Date Code
20,260,228
Total cash receivedSecond Certified Work Ex Tax
120,000
Total cash receivedSecond Cash Received Ex Tax
100,000
Total cash receivedSecond Retention Released Ex Tax
0
Total cash receivedSecond Project Cost Outflow Ex Tax
118,000

Cash still due

Cash still duetotal collectible amount - total cash received29,500 , ex tax
Result29,500.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Cash still dueRetention Rate
0.05
Cash still dueRetention Cap Ex Tax
30,000
Cash still dueExpected Release Delay Days
60
Cash still dueOpening Project Cash Ex Tax
15,000
Cash still dueFirst Claim Date Code
20,260,131
Cash still dueFirst Certified Work Ex Tax
90,000
Cash still dueFirst Cash Received Ex Tax
70,000
Cash still dueFirst Retention Released Ex Tax
0
Cash still dueFirst Project Cost Outflow Ex Tax
82,000
Cash still dueSecond Claim Date Code
20,260,228
Cash still dueSecond Certified Work Ex Tax
120,000
Cash still dueSecond Cash Received Ex Tax
100,000
Cash still dueSecond Retention Released Ex Tax
0
Cash still dueSecond Project Cost Outflow Ex Tax
118,000

Project cost outflow

Project cost outflowsum of project cost cash outflows200,000 , ex tax
Result200,000.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Project cost outflowRetention Rate
0.05
Project cost outflowRetention Cap Ex Tax
30,000
Project cost outflowExpected Release Delay Days
60
Project cost outflowOpening Project Cash Ex Tax
15,000
Project cost outflowFirst Claim Date Code
20,260,131
Project cost outflowFirst Certified Work Ex Tax
90,000
Project cost outflowFirst Cash Received Ex Tax
70,000
Project cost outflowFirst Retention Released Ex Tax
0
Project cost outflowFirst Project Cost Outflow Ex Tax
82,000
Project cost outflowSecond Claim Date Code
20,260,228
Project cost outflowSecond Certified Work Ex Tax
120,000
Project cost outflowSecond Cash Received Ex Tax
100,000
Project cost outflowSecond Retention Released Ex Tax
0
Project cost outflowSecond Project Cost Outflow Ex Tax
118,000

Closing project cash

Closing project cashopening cash + receipts - project cost outflows-15,000 , ex tax
Result-15,000.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Closing project cashRetention Rate
0.05
Closing project cashRetention Cap Ex Tax
30,000
Closing project cashExpected Release Delay Days
60
Closing project cashOpening Project Cash Ex Tax
15,000
Closing project cashFirst Claim Date Code
20,260,131
Closing project cashFirst Certified Work Ex Tax
90,000
Closing project cashFirst Cash Received Ex Tax
70,000
Closing project cashFirst Retention Released Ex Tax
0
Closing project cashFirst Project Cost Outflow Ex Tax
82,000
Closing project cashSecond Claim Date Code
20,260,228
Closing project cashSecond Certified Work Ex Tax
120,000
Closing project cashSecond Cash Received Ex Tax
100,000
Closing project cashSecond Retention Released Ex Tax
0
Closing project cashSecond Project Cost Outflow Ex Tax
118,000

Peak project funding gap

Peak project funding gaplargest shortfall below zero cash across claim periods15,000 , ex tax
Result15,000.00

Uses the named industry records and reports this output, ex tax. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Peak project funding gapRetention Rate
0.05
Peak project funding gapRetention Cap Ex Tax
30,000
Peak project funding gapExpected Release Delay Days
60
Peak project funding gapOpening Project Cash Ex Tax
15,000
Peak project funding gapFirst Claim Date Code
20,260,131
Peak project funding gapFirst Certified Work Ex Tax
90,000
Peak project funding gapFirst Cash Received Ex Tax
70,000
Peak project funding gapFirst Retention Released Ex Tax
0
Peak project funding gapFirst Project Cost Outflow Ex Tax
82,000
Peak project funding gapSecond Claim Date Code
20,260,228
Peak project funding gapSecond Certified Work Ex Tax
120,000
Peak project funding gapSecond Cash Received Ex Tax
100,000
Peak project funding gapSecond Retention Released Ex Tax
0
Peak project funding gapSecond Project Cost Outflow Ex Tax
118,000

First shortfall date

First shortfall datefirst chronological claim date with closing cash below zero2026-02-28
Result2026-02-28

Uses the named industry records and reports this output in ISO calendar date. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
First shortfall dateRetention Rate
0.05
First shortfall dateRetention Cap Ex Tax
30,000
First shortfall dateExpected Release Delay Days
60
First shortfall dateOpening Project Cash Ex Tax
15,000
First shortfall dateFirst Claim Date Code
20,260,131
First shortfall dateFirst Certified Work Ex Tax
90,000
First shortfall dateFirst Cash Received Ex Tax
70,000
First shortfall dateFirst Retention Released Ex Tax
0
First shortfall dateFirst Project Cost Outflow Ex Tax
82,000
First shortfall dateSecond Claim Date Code
20,260,228
First shortfall dateSecond Certified Work Ex Tax
120,000
First shortfall dateSecond Cash Received Ex Tax
100,000
First shortfall dateSecond Retention Released Ex Tax
0
First shortfall dateSecond Project Cost Outflow Ex Tax
118,000

Expected final retention release date

Expected final retention release datelast claim date + expected release delay when retention remains held2026-04-29
Result2026-04-29

Uses the named industry records and reports this output in ISO calendar date. The shared engine retains full precision; display rounding never feeds the calculation.

Construction Retention Cash-flow Planner formulas โ†’
Inputs used by these formula steps
Expected final retention release dateRetention Rate
0.05
Expected final retention release dateRetention Cap Ex Tax
30,000
Expected final retention release dateExpected Release Delay Days
60
Expected final retention release dateOpening Project Cash Ex Tax
15,000
Expected final retention release dateFirst Claim Date Code
20,260,131
Expected final retention release dateFirst Certified Work Ex Tax
90,000
Expected final retention release dateFirst Cash Received Ex Tax
70,000
Expected final retention release dateFirst Retention Released Ex Tax
0
Expected final retention release dateFirst Project Cost Outflow Ex Tax
82,000
Expected final retention release dateSecond Claim Date Code
20,260,228
Expected final retention release dateSecond Certified Work Ex Tax
120,000
Expected final retention release dateSecond Cash Received Ex Tax
100,000
Expected final retention release dateSecond Retention Released Ex Tax
0
Expected final retention release dateSecond Project Cost Outflow Ex Tax
118,000

Inputs used

Contract retention rate (decimal fraction of certified work withheld)
0.05
Contract retention cap (/project retention balance, ex tax)
30,000
Expected release delay (whole days from last claim to final release)
60
Opening project cash (/project before first claim, ex tax)
15,000
First claim date (YYYYMMDD date code for first claim)
20,260,131
First claim certified work (/first claim, ex tax)
90,000
First claim cash received (/first claim period, ex tax)
70,000
First claim retention released (/first claim period, ex tax)
0
First claim project cost outflow (/first claim period, ex tax)
82,000
Second claim date (YYYYMMDD date code for second claim)
20,260,228
Second claim certified work (/second claim, ex tax)
120,000
Second claim cash received (/second claim period, ex tax)
100,000
Second claim retention released (/second claim period, ex tax)
0
Second claim project cost outflow (/second claim period, ex tax)
118,000
Open this calculator with preset values

This calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.

Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.

Example: https://margin101.com/tools/construction-retention/?sv=1&expectedReleaseDelayDays=60&firstCashReceivedExTax=70000&firstCertifiedWorkExTax=90000&firstClaimDateCode=20260131&firstProjectCostOutflowExTax=82000&firstRetentionReleasedExTax=0&openingProjectCashExTax=15000&retentionCapExTax=30000&retentionRate=0.05&secondCashReceivedExTax=100000&secondCertifiedWorkExTax=120000&secondClaimDateCode=20260228&secondProjectCostOutflowExTax=118000&secondRetentionReleasedExTax=0

ParameterMeaningUnitAllowed valuesPresenceDefault
expectedReleaseDelayDaysWhole days from the last claim date to expected final retention release.whole days from last claim to final release0 to 3650Required60
firstCashReceivedExTaxAll customer cash actually received in the first claim period, including any payment arising from released retention. The separate release field updates the retention ledger and is not added to cash again. Keep every amount on the same ex-tax currency basis.currency units/first claim period, ex tax0 to 10000000Required70000
firstCertifiedWorkExTaxWork certified in the first claim period. Keep every amount on the same ex-tax currency basis.currency units/first claim, ex tax0 to 10000000Required90000
firstClaimDateCodeEnter the first claim date as eight digits in YYYYMMDD format.YYYYMMDD date code for first claim10000101 to 99991231Required20260131
firstProjectCostOutflowExTaxLabour, supplier and subcontractor cash paid in the first period. Keep every amount on the same ex-tax currency basis.currency units/first claim period, ex tax0 to 10000000Required82000
firstRetentionReleasedExTaxRetention released during the first claim period. Keep every amount on the same ex-tax currency basis.currency units/first claim period, ex tax0 to 10000000Required0
openingProjectCashExTaxCash available to fund the two claim periods.currency units/project before first claim, ex tax-100000000 to 100000000Required15000
retentionCapExTaxMaximum retention balance allowed under the entered contract assumptions. Keep every amount on the same ex-tax currency basis.currency units/project retention balance, ex tax0 to 10000000Required30000
retentionRateRate withheld under the entered contract assumption.decimal fraction of certified work withheld0 to 1Required0.05
secondCashReceivedExTaxAll customer cash actually received in the second claim period, including any payment arising from released retention. The separate release field updates the retention ledger and is not added to cash again. Keep every amount on the same ex-tax currency basis.currency units/second claim period, ex tax0 to 10000000Required100000
secondCertifiedWorkExTaxWork certified in the second claim period. Keep every amount on the same ex-tax currency basis.currency units/second claim, ex tax0 to 10000000Required120000
secondClaimDateCodeEnter the later claim date as eight digits in YYYYMMDD format.YYYYMMDD date code for second claim10000101 to 99991231Required20260228
secondProjectCostOutflowExTaxLabour, supplier and subcontractor cash paid in the second period. Keep every amount on the same ex-tax currency basis.currency units/second claim period, ex tax0 to 10000000Required118000
secondRetentionReleasedExTaxRetention released during the second claim period. Keep every amount on the same ex-tax currency basis.currency units/second claim period, ex tax0 to 10000000Required0

Construction Retention: receipts and project outflows

Retention is a timing exposure: project profit and project cash can move differently.

Formula summary

Primary formula
largest shortfall below zero cash across claim periods

Read the full methodology

Data used here

  • The estimate uses your inputs and the general business formula documented in the methodology.

Decision checks

Act on the result

Plan funding before the peak gap and confirm release milestones in the contract.

Stress-test the decision

Retest slower receipts and a longer expected release delay.

When this estimate can be misleading

  • Industry costs, tax, contract terms, capacity and targets are entered by the user; no market benchmark is embedded.
  • Use records from one consistent period and one ex-tax currency basis where money applies.
  • This is educational business decision support, not accounting, tax, legal or financial advice.
  • Retention is a timing exposure: project profit and project cash can move differently.

Educational estimate, not advice. See all assumptions & limitations โ†’

Guides to interpret the decision and its assumptions.

Frequently asked questions

How do I model construction retention withholding, release timing and project cash exposure?

Plan funding before the peak gap and confirm release milestones in the contract.

Which planning assumptions should I stress-test?

Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.