Act on the result
Use the peak capacity gap to schedule labour, reduce the pick workload or cap accepted peak orders.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Warehouse operators matching order demand with pick-and-pack labour capacity.
Available capacity, capacity gap, labour utilisation and required labour hours.
Use productive labour time and measured minutes per order for one period.
Use a different tool when: Do not use this to compare self-fulfilment and third-party cost contracts at a chosen order volume; use Fulfilment Cost Comparison Planner for that decision. Use this tool to plan pick-and-pack capacity for peak order demand.
Commerce & operations
Available capacity, capacity gap, labour utilisation and required labour hours.
Find labour capacity required for peak order volume.
Your numbers stay in this browser
Whole workers available.
Paid hours in the period.
Share available for picking.
Measured pick rate.
Average picks required per order.
Orders required in the period.
Each output is bound to its registered ecommerce engine formula.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
workers ร paid hours ร productive rate600 unitsReports units for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.
Pick & Pack Capacity Planner formulas โproductive hours ร picks per hour30,000 unitsReports units for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.
Pick & Pack Capacity Planner formulas โfloor(pick capacity / picks per order)10,000 unitsReports units for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.
Pick & Pack Capacity Planner formulas โmax(0, demand orders โ order capacity)2,000 unitsReports units for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.
Pick & Pack Capacity Planner formulas โdemand orders / order capacity1.2 percentReports percent for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.
Pick & Pack Capacity Planner formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| demandOrders | Orders required in the period. | whole events/planning period | 0 to 100000000 | Required | 12000 |
| paidHoursPerWorker | Paid hours in the period. | hours/planning period | 0 to 10000 | Required | 160 |
| picksPerOrder | Average picks required per order. | picks/order | 0.01 to 100000 | Required | 3 |
| picksPerProductiveHour | Measured pick rate. | picks/productive labour hour | 0.01 to 100000 | Required | 50 |
| productiveTimeRate | Share available for picking. | proportion of paid warehouse hours available for picking and packing | 0 to 1 | Required | 0.75 |
| workers | Whole workers available. | whole warehouse workers | 0 to 100000000 | Required | 5 |
The peak capacity gap compares order demand with productive labour time, measured pick speed and picks required per order.
Data used here
Use the peak capacity gap to schedule labour, reduce the pick workload or cap accepted peak orders.
Retest picks per productive hour and average picks per order using the same measured warehouse period.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Compare user-entered fixed, per-order and loaded-labour costs while keeping capacity and service-level trade-offs explicit.
Read guideUse the peak capacity gap to schedule labour, reduce the pick workload or cap accepted peak orders.
Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.