Primary formula: order capacity = floor(workers ร— paid hours ร— productive rate ร— picks per hour / picks per order)

Educational only: Business decision support, not accounting, tax or legal advice.

Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.

Update policy: Reviewed when formulas or official dependencies change.

Scope: Market-neutral small-business planning using your own assumptions.

What this planner helps you decide

Best for

Warehouse operators matching order demand with pick-and-pack labour capacity.

Outputs

Available capacity, capacity gap, labour utilisation and required labour hours.

Start here

Use productive labour time and measured minutes per order for one period.

Use a different tool when: Do not use this to compare self-fulfilment and third-party cost contracts at a chosen order volume; use Fulfilment Cost Comparison Planner for that decision. Use this tool to plan pick-and-pack capacity for peak order demand.

Commerce & operations

Pick & Pack Capacity: available capacity

Available capacity, capacity gap, labour utilisation and required labour hours.

Pick & Pack Capacity

Find labour capacity required for peak order volume.

Your numbers stay in this browser

Whole workers available.

Paid hours in the period.

%

Share available for picking.

Measured pick rate.

Average picks required per order.

Orders required in the period.

Decision result

Each output is bound to its registered ecommerce engine formula.

Preparing export actionsโ€ฆ
Productive Hours
600
Pick Capacity
30,000
Order Capacity
10,000
Peak capacity gap
2,000
Utilisation Rate
120%

Scenario comparison

Each row names the assumption axis changed from the baseline.

ScenarioResultDifference
Current scenario2,000.00Baseline
Lower Peak demand orders1,400.00-600.00
Higher Peak demand orders2,600.00600.00

Save these results, change an input, then compare the updated figures with this baseline.

The baseline is temporary in this tab and is not added to shared scenario links or generated reports.

Calculation details

View calculation detailsView the formulas and inputs used for these results.

Productive Hours

Productive Hoursworkers ร— paid hours ร— productive rate600 units
Result600

Reports units for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.

Pick & Pack Capacity Planner formulas โ†’
Inputs used by these formula steps
Productive HoursWorkers
5
Productive HoursPaid Hours Per Worker
160
Productive HoursProductive Time Rate
0.75
Productive HoursPicks Per Productive Hour
50
Productive HoursPicks Per Order
3
Productive HoursDemand Orders
12,000

Pick Capacity

Pick Capacityproductive hours ร— picks per hour30,000 units
Result30,000

Reports units for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.

Pick & Pack Capacity Planner formulas โ†’
Inputs used by these formula steps
Pick CapacityWorkers
5
Pick CapacityPaid Hours Per Worker
160
Pick CapacityProductive Time Rate
0.75
Pick CapacityPicks Per Productive Hour
50
Pick CapacityPicks Per Order
3
Pick CapacityDemand Orders
12,000

Order Capacity

Order Capacityfloor(pick capacity / picks per order)10,000 units
Result10,000

Reports units for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.

Pick & Pack Capacity Planner formulas โ†’
Inputs used by these formula steps
Order CapacityWorkers
5
Order CapacityPaid Hours Per Worker
160
Order CapacityProductive Time Rate
0.75
Order CapacityPicks Per Productive Hour
50
Order CapacityPicks Per Order
3
Order CapacityDemand Orders
12,000

Peak capacity gap

Capacity Gap Ordersmax(0, demand orders โˆ’ order capacity)2,000 units
Result2,000

Reports units for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.

Pick & Pack Capacity Planner formulas โ†’
Inputs used by these formula steps
Capacity Gap OrdersWorkers
5
Capacity Gap OrdersPaid Hours Per Worker
160
Capacity Gap OrdersProductive Time Rate
0.75
Capacity Gap OrdersPicks Per Productive Hour
50
Capacity Gap OrdersPicks Per Order
3
Capacity Gap OrdersDemand Orders
12,000

Utilisation Rate

Utilisation Ratedemand orders / order capacity1.2 percent
Result120%

Reports percent for the entered planning period using the declared ex-tax cost and revenue basis. The engine retains full precision; presentation rounding does not feed calculation.

Pick & Pack Capacity Planner formulas โ†’
Inputs used by these formula steps
Utilisation RateWorkers
5
Utilisation RatePaid Hours Per Worker
160
Utilisation RateProductive Time Rate
0.75
Utilisation RatePicks Per Productive Hour
50
Utilisation RatePicks Per Order
3
Utilisation RateDemand Orders
12,000

Inputs used

Workers
5
Paid hours per worker
160
Productive time rate
75%
Picks per productive hour
50
Picks per order
3
Peak demand orders
12,000
Open this calculator with preset values

This calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.

Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.

Example: https://margin101.com/tools/warehouse-pick-pack-capacity/?sv=1&demandOrders=12000&paidHoursPerWorker=160&picksPerOrder=3&picksPerProductiveHour=50&productiveTimeRate=0.75&workers=5

ParameterMeaningUnitAllowed valuesPresenceDefault
demandOrdersOrders required in the period.whole events/planning period0 to 100000000Required12000
paidHoursPerWorkerPaid hours in the period.hours/planning period0 to 10000Required160
picksPerOrderAverage picks required per order.picks/order0.01 to 100000Required3
picksPerProductiveHourMeasured pick rate.picks/productive labour hour0.01 to 100000Required50
productiveTimeRateShare available for picking.proportion of paid warehouse hours available for picking and packing0 to 1Required0.75
workersWhole workers available.whole warehouse workers0 to 100000000Required5

Pick & Pack Capacity: available capacity

The peak capacity gap compares order demand with productive labour time, measured pick speed and picks required per order.

Formula summary

Primary formula
order capacity = floor(workers ร— paid hours ร— productive rate ร— picks per hour / picks per order)

Read the full methodology

Data used here

  • The estimate uses your inputs and the general business formula documented in the methodology.

Decision checks

Act on the result

Use the peak capacity gap to schedule labour, reduce the pick workload or cap accepted peak orders.

Stress-test the decision

Retest picks per productive hour and average picks per order using the same measured warehouse period.

When this estimate can be misleading

  • All provider fees, exchange rates, returns, demand and operating rates are user-entered scenarios.
  • Use one consistent ex-tax currency and planning period across compared inputs.
  • This is educational business decision support, not accounting, tax, legal or financial advice.
  • The peak capacity gap compares order demand with productive labour time, measured pick speed and picks required per order.

Educational estimate, not advice. See all assumptions & limitations โ†’

Guides to interpret the decision and its assumptions.

Frequently asked questions

How do I plan pick-and-pack capacity for peak order demand?

Use the peak capacity gap to schedule labour, reduce the pick workload or cap accepted peak orders.

Which planning assumptions should I stress-test?

Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.