Act on the result
Document the chosen base and check that projected jobs recover the full entered overhead pool.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Project businesses distributing a defined overhead pool across jobs or productive capacity.
Overhead pool, recovery base, recovery rate and allocated project overhead.
Define which costs are in the overhead pool, then choose one recovery base without duplicating direct costs.
Use a different tool when: Do not use this to find completion, billing or contribution threshold for a project; use Project Break-even Planner for that decision. Use this tool to choose a transparent overhead recovery base across jobs.
Quote & capacity
Overhead pool, recovery base, recovery rate and allocated project overhead.
Amounts use the same currency as your inputs. No currency conversion is performed.
Turn period overhead and productive capacity into an hourly recovery rate, then compare required project recovery with overhead already billed.
Your numbers stay in this browser
Enter the overhead pool to recover for one consistent period. Use one consistent ex-tax basis.
Enter the productive hours available to recover that overhead pool.
Enter productive hours assigned to this project.
Enter overhead currently included in the project price. Use one consistent ex-tax basis.
Use the cost and recovery rows to identify the component changing the exact reconciliation.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
period overhead รท period productive hours20.00Uses only the entered market-neutral commercial records and assumptions. Raw engine precision is retained until display.
Project Overhead Recovery Planner formulas โoverhead rate per hour ร project hours800.00Uses only the entered market-neutral commercial records and assumptions. Raw engine precision is retained until display.
Project Overhead Recovery Planner formulas โoverhead billed โ project overhead required-100.00Uses only the entered market-neutral commercial records and assumptions. Raw engine precision is retained until display.
Project Overhead Recovery Planner formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| overheadBilledExTax | Enter overhead currently included in the project price. Use one consistent ex-tax basis. | currency units/project, ex tax | 0 to 10000000 | Required | 700 |
| overheadPerPeriodExTax | Enter the overhead pool to recover for one consistent period. Use one consistent ex-tax basis. | currency units/period, ex tax | 0 to 10000000 | Required | 24000 |
| productiveHoursPerPeriod | Enter the productive hours available to recover that overhead pool. | hours/period | 0.01 to 100000000 | Required | 1200 |
| projectHours | Enter productive hours assigned to this project. | hours/project | 0 to 100000000 | Required | 40 |
The overhead pool and recovery base must be mutually consistent and must not duplicate direct job costs.
Data used here
Document the chosen base and check that projected jobs recover the full entered overhead pool.
Retest fewer jobs or productive hours and a higher overhead pool.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Classify traceability and cost behaviour separately against a named object, activity driver, period and relevant range.
Read guideDefine the pool and object, compare plausible allocation drivers and retain an unallocated contribution view.
Read guideDocument the chosen base and check that projected jobs recover the full entered overhead pool.
Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.