Act on the result
Agree which projects share the unrecovered setup, travel, freight, permit and equipment cost.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Project businesses allocating unrecovered setup, travel, freight, permit and equipment cost across expected projects.
Total mobilisation cost, unrecovered cost and required recovery per expected project.
Enter the mobilisation cost stack, amount already recovered and whole project count sharing the remainder.
Use a different tool when: Do not use this to align milestone billing with cost timing and retention; use Progress Billing Cash Planner for that decision. Use this tool to set a mobilisation charge from setup, travel, permits and idle capacity.
Quote & capacity
Total mobilisation cost, unrecovered cost and required recovery per expected project.
Amounts use the same currency as your inputs. No currency conversion is performed.
Set a transparent recovery amount from setup labour, travel, freight, permits and equipment after amounts already recovered.
Your numbers stay in this browser
Enter loaded labour cost required to mobilise the work program. Use one consistent ex-tax basis.
Enter mobilisation travel, delivery and freight cost. Use one consistent ex-tax basis.
Enter permits, equipment setup and other mobilisation cost. Use one consistent ex-tax basis.
Enter the whole project count sharing the remaining mobilisation cost.
Enter mobilisation cost already recovered from customers. Use one consistent ex-tax basis.
Use the cost and recovery rows to identify the component changing the exact reconciliation.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
setup labour + travel and freight + permits and equipment4,000.00Uses only the entered market-neutral commercial records and assumptions. Raw engine precision is retained until display.
Mobilisation Cost Recovery Planner formulas โmaximum of zero and total mobilisation cost โ amount already recovered3,000.00Uses only the entered market-neutral commercial records and assumptions. Raw engine precision is retained until display.
Mobilisation Cost Recovery Planner formulas โunrecovered mobilisation cost รท expected projects750.00Uses only the entered market-neutral commercial records and assumptions. Raw engine precision is retained until display.
Mobilisation Cost Recovery Planner formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| amountAlreadyRecoveredExTax | Enter mobilisation cost already recovered from customers. Use one consistent ex-tax basis. | currency units/mobilisation program, ex tax | 0 to 10000000 | Required | 1000 |
| expectedProjects | Enter the whole project count sharing the remaining mobilisation cost. | whole projects | 0 to 100000000 | Required | 4 |
| permitsAndEquipmentExTax | Enter permits, equipment setup and other mobilisation cost. Use one consistent ex-tax basis. | currency units/mobilisation program, ex tax | 0 to 10000000 | Required | 1000 |
| setupLabourExTax | Enter loaded labour cost required to mobilise the work program. Use one consistent ex-tax basis. | currency units/mobilisation program, ex tax | 0 to 10000000 | Required | 2000 |
| travelAndFreightExTax | Enter mobilisation travel, delivery and freight cost. Use one consistent ex-tax basis. | currency units/mobilisation program, ex tax | 0 to 10000000 | Required | 1000 |
Mobilisation is a separate cost event; hiding it inside later rates can leave early cash unrecovered.
Data used here
Agree which projects share the unrecovered setup, travel, freight, permit and equipment cost.
Retest higher setup cost, a smaller amount already recovered and fewer expected projects.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Reconcile call-out work with travel, loaded labour, recovery and daily capacity on one job basis.
Read guideAgree which projects share the unrecovered setup, travel, freight, permit and equipment cost.
Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.