Act on the result
Verify the ownership-cost period and realistic chargeable utilisation before quoting the job.
Educational only: Business decision support, not accounting, tax or legal advice.
Privacy: No account is required. Tool inputs and results stay in this browser. Anonymous categorical usage analytics send only governed page, tool, cluster and action identifiers; tool inputs and results are never sent. Error monitoring is disabled. Optional saved state stays only on this device.
Update policy: Reviewed when formulas or official dependencies change.
Scope: Market-neutral small-business planning using your own assumptions.
Project businesses allocating equipment ownership and operating cost to chargeable use.
Period ownership cost, productive use, allocated cost per hour and job equipment cost.
Use one ownership-cost period and a realistic productive-use estimate before entering job usage.
Use a different tool when: Do not use this to compare quoted and actual job economics and identify overruns; use Job Costing & Margin Planner for that decision. Use this tool to allocate ownership, maintenance and utilisation cost to jobs.
Quote & capacity
Period ownership cost, productive use, allocated cost per hour and job equipment cost.
Amounts use the same currency as your inputs. No currency conversion is performed.
Allocate equipment ownership and maintenance cost across productive hours, then assign the resulting cost and consumables to one project.
Your numbers stay in this browser
Enter depreciation, lease or other ownership cost for the selected period. Use one consistent ex-tax basis.
Enter maintenance and service cost for the same period. Use one consistent ex-tax basis.
Enter realistic productive equipment hours for the selected period.
Enter the equipment hours consumed by this project.
Enter equipment consumables used specifically by this project. Use one consistent ex-tax basis.
Use the cost and recovery rows to identify the component changing the exact reconciliation.
Each row names the assumption axis changed from the baseline.
Save these results, change an input, then compare the updated figures with this baseline.
The baseline is temporary in this tab and is not added to shared scenario links or generated reports.
(ownership cost + maintenance cost) รท productive equipment hours15.00Uses only the entered market-neutral commercial records and assumptions. Raw engine precision is retained until display.
Equipment Cost Allocation Planner formulas โequipment cost per hour ร project use hours + project consumables250.00Uses only the entered market-neutral commercial records and assumptions. Raw engine precision is retained until display.
Equipment Cost Allocation Planner formulas โThis calculator supports documented, shareable scenario URLs. Compatible assistants and applications can construct links using the parameters below.
Scenario links contain only allowlisted numeric and closed-choice inputs shown in the URL; Margin101 excludes free text and identifying fields. Anyone you share the URL with can read those numbers, so do not include private or identifying data.
| Parameter | Meaning | Unit | Allowed values | Presence | Default |
|---|---|---|---|---|---|
| maintenanceCostPerPeriodExTax | Enter maintenance and service cost for the same period. Use one consistent ex-tax basis. | currency units/period, ex tax | 0 to 10000000 | Required | 3000 |
| ownershipCostPerPeriodExTax | Enter depreciation, lease or other ownership cost for the selected period. Use one consistent ex-tax basis. | currency units/period, ex tax | 0 to 10000000 | Required | 12000 |
| productiveHoursPerPeriod | Enter realistic productive equipment hours for the selected period. | hours/period | 0.01 to 100000000 | Required | 1000 |
| projectConsumablesExTax | Enter equipment consumables used specifically by this project. Use one consistent ex-tax basis. | currency units/project, ex tax | 0 to 10000000 | Required | 100 |
| projectUseHours | Enter the equipment hours consumed by this project. | hours/project | 0 to 100000000 | Required | 10 |
Allocate equipment cost using productive use, not total calendar availability.
Data used here
Verify the ownership-cost period and realistic chargeable utilisation before quoting the job.
Retest lower utilisation, higher maintenance and longer job usage.
Educational estimate, not advice. See all assumptions & limitations โ
Guides to interpret the decision and its assumptions.
Compare estimated and actual labour, materials, subcontractors and overhead, then choose the next pricing or delivery action.
Read guideVerify the ownership-cost period and realistic chargeable utilisation before quoting the job.
Compare a plausible alternative scenario and verify the decision-critical assumption that changes the plan most.